Croatian Transit Gas Pipeline, Báta-Városföld Compressor Station (FGSZ)

Year Project (Investor) Customer Delivered products Quantity
2010 Croatian transit pipeline, Báta-Városföld compressor station (FGSZ) Turbo Team Ltd. DN15-1000 PE coated seamless and welded steel pipes 850 tons

Croatian transit pipeline, Báta-Városföld compressor station (2009-2010)

Customer:
Turbo Team Ltd.

Investor:
FGSZ Ltd.

Location:
Báta, Városföld

Technical specifications:

  • Product: seamless and SAW longitudinal seamless steel pipes
  • Sizes: 21,3-1016,0 mm diameter range
  • Standard / grade: EN10216-2 / P235GH TC1,
    EN10216-3, EN10217-3 / P355NH TC2
  • Coating: 3 layer PE coated DIN30670 N-n, N-v,
    internal epoxy, API RP 5L2, 120 micron

Deliveries:
45 trucks/ 850 tons

Project duration:
6 months

Suppliers:
9 suppliers from 7 European countries
(warehouses, steel tube manufacturer, subcontractors)